Skip to main content
Benelux Diving — Inshore & civil diving
All episodes
Working Below The Quay

Below the Waterline · Episode 02

Working Below The Quay

Inspection, maintenance and repair of quay walls, sheet piling, foundations and underwater concrete.

Duration
07:03
Published
4 Key topics

About this episode

Quay wall and sheet piling at the waterline — the transition zone where deterioration starts.
Quay wall and sheet piling at the waterline — the transition zone where deterioration starts.

Quay walls, sheet piling and underwater concrete carry loads every day, yet the part that fails first is almost always the part nobody sees. This episode follows a quay from first inspection to completed repair.

We cover how damage develops — corrosion of steel, washed-out joints, scour behind the wall, deteriorated concrete at the tidal zone — and how a dive team measures it: thickness readings, visual and tactile inspection, and photographic and video documentation that an engineer can actually use.

We then walk through the repair sequence, from cleaning and preparation to grouting, underwater concrete and steel repairs, and explain why sequencing and reporting decide whether a repair lasts a season or a generation.

Key topics

  1. 01Concrete deterioration
  2. 02Thickness measurement
  3. 03Repair sequencing
  4. 04Reporting

Field Notes

Project updates, technical insights and stories from below the waterline.

Receive occasional updates about civil diving projects, underwater infrastructure, ROV inspections, equipment and new podcast episodes. No generic marketing.

I agree to receive the Field Notes newsletter and have read the privacy policy.

24/7 Operations+31 6 21 42 31 29