15 Jun 2026 · Canal lock, Belgium

Working inside a short lock maintenance window

Seal replacement and debris clearance during a planned closure, with the schedule fixed by the waterway authority.

Two topside tenders operating a dive control panel beside a steel lock gate.

Lock closures are short and shared with other disciplines, so the dive sequence was agreed in advance and rehearsed dry on the quayside.

Debris was cleared from the gate recess first, then the seal fixings were released and the new seal fitted section by section under continuous surface communication.

The gate was cycled and checked before the lock reopened on schedule.

Services

Assembly work

Underwater assembly, bolting and fitting of components on civil and port structures.

services.readMore

Field Notes

Project updates, technical insights and stories from below the waterline.

Receive occasional updates about civil diving projects, underwater infrastructure, ROV inspections, equipment and new podcast episodes. No generic marketing.

I agree to receive the Field Notes newsletter and have read the privacy policy.

24/7 Operations+31 6 21 42 31 29