Assembly work
Components that must be positioned below water need accurate handling, secure fixing and verification. We carry out assembly work as part of a contractor's programme, coordinating directly with the site team.
Working area
NL · BE
Dive system
Surface-supplied
Reporting
Video + written
Availability
24/7
In detail
Underwater assembly is precision work done blind. Fenders, ladders, guide rails, gate seals, pipe sections, cable ducts, anchor plates and precast elements all have to end up within tolerance, bolted to the right torque, on a structure the diver can usually only feel. The difference between a smooth installation and a lost day is almost always the preparation done on the quay before anyone enters the water.
We trial-fit dry wherever the component allows it, agree torque values and tooling in advance, and rig lifting so the element arrives at the diver already close to its final position. Underwater the team follows a fixed sequence with topside confirmation at each hold point: located, aligned, engaged, torqued, checked. The supervisor sees the helmet camera and signs off each step before the next begins.
Assembly rarely stands alone: it is a link in a contractor's programme, between a crane movement and a concrete pour. We plan around that, attend the site's daily coordination, work under its permit-to-work system and hand back the interface with photographic evidence so the main contractor can close the activity in their own quality file.
What you receive
- Method statement with tooling, torque and lifting arrangement
- Dry trial fit where the component allows
- Hold-point sign-off per installed element
- Photo and video verification of the finished fixing
- Interface hand-over note for the main contractor
Typical civil applications
- Bolting and fixing of steelwork
- Fitting of fenders, ladders and guides
- Installation of pipes and cable ducts
- Positioning of precast elements
- Fitting of gate seals
Structures involved
- Lock gates
- Quay furniture
- Jetties and pontoons
- Intake and outfall structures
Working method
Fit-up is prepared dry wherever possible: tooling, torque values and lifting arrangements are agreed before the dive. Underwater the team works to a fixed sequence with topside confirmation at each hold point.
Equipment and techniques
- Hydraulic torque tools
- Lifting bags and rigging
- Underwater drilling equipment
- Video verification
Safety considerations
- Lifting plan and load control
- Tool tethering
- Pinch and entrapment assessment
- Communication discipline during handling
Related services
All servicesCommercial diving services
Surface-supplied dive teams for inspection, construction and repair in ports, canals and rivers.
Renovation of quay walls
Inspection, concrete repair and reinforcement of quay walls and sheet piling below water.
Bricklaying and pointing quay walls
Underwater masonry repair: raking out, rebuilding and repointing historic brick and block quay walls.