19 Mar 2026 · River quay, Netherlands

Restoring the bed profile at a quay toe

Repeated propeller wash had lowered the bed in front of a quay. Protection was placed back to the design profile and verified.

Rock armour being placed along a river quay from a crane on the bank.

A pre-placement survey established how much material had been lost and where the deepest scour holes had formed.

Rock was placed from the bank under diver guidance, working in strips so the profile could be checked as the work progressed. A closing survey confirmed coverage against the specification.

Services

Laying soil and scour protection

Placement and repair of rock, mattress and geotextile protection at structure toes and bed level.

services.readMore

Field Notes

Project updates, technical insights and stories from below the waterline.

Receive occasional updates about civil diving projects, underwater infrastructure, ROV inspections, equipment and new podcast episodes. No generic marketing.

I agree to receive the Field Notes newsletter and have read the privacy policy.

24/7 Operations+31 6 21 42 31 29