Laying soil and scour protection
Propeller wash and current strip material from the bed in front of quays, piers and gates. We survey the affected area, place protection to the design profile and confirm coverage afterwards.
Working area
NL · BE
Dive system
Surface-supplied
Reporting
Video + written
Availability
24/7
In detail
Bow thrusters, main propellers and river current move more material than most asset owners expect. In front of a busy berth, a single winter of manoeuvring can pull a metre of bed material away from the toe of the wall; around a bridge pier, current does the same job more slowly but just as effectively. Once the bed drops below design level, the structure loses passive support exactly where it needs it most.
We start with a pre-placement survey: soundings or multibeam data combined with a diver or ROV inspection of the toe, so the volume that has actually been lost is known before material is ordered. Protection is then built up to the design profile — graded rock, gravel filter layers, geotextile or concrete mattresses — placed from a pontoon or crane under diver guidance, in layers that will not damage the structure they protect.
The job is only finished when coverage is proven. A post-placement survey compares the achieved profile with the specification, and the difference plot goes into the asset file. For berths with heavy thruster loads we usually advise a repeat sounding after the first season — protection that is monitored lasts years longer than protection that is placed and forgotten.
What you receive
- Pre-placement bed survey and lost-volume calculation
- Material specification and placement plan
- Placement under diver or ROV guidance, logged per section
- Post-placement survey with difference plot against design
- Monitoring advice and recommended re-survey interval
Typical civil applications
- Scour repair at quay toes
- Bed protection around bridge piers
- Protection at lock approaches
- Placement of concrete mattresses and geotextile
Structures involved
- Quay toes
- Bridge piers
- Lock approaches
- Pipeline and cable crossings
Working method
Pre-placement survey establishes the existing bed profile. Material is placed from a pontoon or crane under diver or ROV guidance, and a post-placement survey confirms level and coverage against the specification.
Equipment and techniques
- Survey and sounding equipment
- Grab and crane placement
- Concrete mattresses and geotextile
- Diver-held positioning aids
Safety considerations
- No diver under suspended load
- Clear lifting and signalling plan
- Current and propeller wash assessment
- Waterway traffic coordination
Related services
All servicesCommercial diving services
Surface-supplied dive teams for inspection, construction and repair in ports, canals and rivers.
Renovation of quay walls
Inspection, concrete repair and reinforcement of quay walls and sheet piling below water.
Bricklaying and pointing quay walls
Underwater masonry repair: raking out, rebuilding and repointing historic brick and block quay walls.